03 The works

Where the ore becomes a shipment.

Two films: the company, and the metallurgical grade. The ore is mined at Muslim Bagh and prepared before it is described to a buyer in China, Oman, or Europe.

03.1 Films

The company, and the metallurgical grade.

The first film is the company. The second is the metallurgical chrome ore.

Company
FilmAsian MinesThe company film. The ore, the people, and the export work out of Pakistan.
Product
FilmMetallurgical gradeA closer look at the metallurgical chrome ore prepared for buyers.

03.2 Sequence

What the line is doing.

  1. 01

    Preparation

    At the plant the ore is crushed, sized, and beneficiated to meet that sheet.

  2. 02

    Inspection

    The lot is checked against the sheet. A buyer may appoint an independent surveyor.

  3. 03

    Documents

    Commercial and shipping papers follow the cargo out of Pakistan.

Crushing sets the size. Screening holds that size. Beneficiation is the separation: chromite one way, barren rock the other. None of those steps is a guarantee of a grade you saw somewhere else. They are how a target specification gets within reach.

Finished lots sit in yards at Muslim Bagh and in Karachi. Together those yards cover more than 44,000 square yards.

After that, the lot is checked against the sheet. Moisture and size are as commercial as the chromium. A wet fine and a dry lump are not interchangeable, even before the assay is read.

The chemistry itself is discussed on the chrome ore page. The voyage is discussed with the markets.

03.3 Grounds

Yard, sample, stockpile, loading.

Tell us the cargo.

A quantity, a destination, and the chemistry you need are enough to start.

Request a quote